TR Consulting

                                     Double-click on pictures to enlarge.

 

 

Start

Company

Products

Services

News 

Download

 

TRC  PRODUCTS

Previous page

Click on the navigation text for details.

Heavy Lifting Method

The method and tools are used to safely transfer modules and other objects from a vessel moving in the sea to a platform without using cranes, and without risk of collision between cargo and vessel. Lifting may also be performed under the platform, where cranes cannot reach.

Equipment installation

The platform cranes have certain limitations. May be the capacity is not sufficient, may be you have to    install equipment out of the reach of the crane, or may be the crane capacity has to be de-rated because of the DAF ? Look how we solve this problem !

Life boat platforms

The PEF method makes it safe and easy to install deck sections like life boat platforms in areas out of the reach of the platform cranes. The method saves time, money, hot work, temporary shut-down etc.

Module / Cassette installation

The design and installation method makes it easy to increase the capacity on existing platforms. The method takes advantage of a combination of the heavy lift method, the cassette design and the attachment alternatives to the platform.

Super modules

The design and fabrication method called LMEF opens up for an "open access" parallel logical fabrication schedule with very few activities on the critical path. The method reduces project execution time, accepts late arriving equipment without extra cost and improves the productivity by 35%.

Integrated topsides

The design and fabrication method called IPEF makes it possible to fabricate a strong and fully integrated platform topsides thus saving significant amount of structural steel, and at the same time benefit from the "open access" fabrication method as well as the offshore installation method. 

Platform design

The TRC platform designs and efficient fabrication methods for platforms will reduce initial capital expenditure, reduce time between project start and first oil, lower the cost of maintenance, lower the cost of platform- and system extensions and make the platform and its systems re-usable thus also considerably improving the project Net Present Value. 

HICO machine

Tools to enhance the capacity of existing platform cranes by reducing the dynamic amplification and protecting the crane and cargo during load transfer, is also a spin-off from this development. 

Sub sea pulling machine

In order to simplify pull-in of umbilicals and pipelines to satellite and manifold stations as well as platforms, TRC has developed a sub sea pulling machine.  The state of the art of making pull-ins is normally conducted by a surface vessel with a winch. Due to the water depth and wave motion, a snap action may occur making the umbilical head shoot into the receiving bell-mouth. This may cause damages to the head and clamping mechanisms. To overcome these problems, TRC has developed a pulling machine that takes full control over the pull-in, and at the same time allow the vessel to pull with high speed through the pulling machine when the umbilical head is far away.

Suspension bridges

Suspension bridges fabrication method developed by TRC is probably the only way you can build and erect large suspension bridges through yard fabrication combined with installation of any size fully finished bridge girder sections. In some projects, even a full-span orthotropic steel girder may be installed in one piece with rails, lighting and asphalt. The method does not need cranes for the installation, reduces the site team, saves time, improves quality and productivity. 
 

Go to top

 
TR Consulting, Joh. Falkb.gt. 10, 5538 Haugesund, Norway. Tel: +47 52729124, Fax: +47 52724196, C.E.O. Cell phone.  +47 90 616969  e-mail: trcons@online.no or trcons@start.no