BOOKSHELF CASSETTES.On existing platforms On prepared platforms On new platforms Advantages Previous page This installation method for cassettes and modules is one of the most efficient low cost ways of increasing the capacity of an existing platform. TRC has studied two main scenarios; sequential platform development and platform add-ons. Bookshelf cassettes on existing hot platforms.
Bookshelf cassettes on prepared platforms.
Later, it was planned to install a module with an estimated weight of some 600 ton. In addition, one anticipated that the installation of this module had to take while a drilling rig was operating partially over the platform. TRC proposed a new module geometry, and installation method as shown on the artist impression. Animated presentation will be found as a download. Cassettes for new platform designs from TRC
This particular platform design is one of a series of platforms designed by TRC in order to reduce investment cost, make stepwise development really economical, and at the same time reduce cost of maintenance and final de-commissioning. These platforms may in fact also be moved around to other sites.
The platform is a water injection / gas lift platform with bridge connection to a production platform. The savings in structural steel, installation cost, project execution time etc. reduces the cost with 40% compared to a traditional platform design. The investment profile , hence the NPV of the project will be strongly effected by this.
Advantages:
Take a look at some of the optimized new platform designs from TRC that take full advantage of this design strategy.
|