Double-click on pictures to enlarge. |
|
StartCompanyProductsServicesNewsDownload
|
PIGGY BACK INSTALLATION.
The method is particularly well suited for installation and removal of drilling cassettes. The best results are achieved if the platform is prepared for this method during the design stage.
Advantages:
|
TR Consulting, Joh. Falkb.gt. 10, 5538 Haugesund, Norway. Tel: +47 52729124, Fax: +47 52724196, C.E.O. Cell phone. +47 90 616969 e-mail: trcons@online.no or trcons@start.no |