Double-click on pictures to enlarge. |
|
StartCompanyProductsServicesNewsDownload
|
CASSETTES INSTEAD OF MODULES.Since the PEF installation method grant full- and minute control over the object during installation, the modules could benefit from being designed as cassettes. This means that the module is designed with well defined interface areas to the platform and other cassettes in order to reduce offshore hook up time, hot work and labor cost. |
| Fully tested and commissioned systems onshore | |
| Easy installation by the use of defined interface areas | |
| Reduced cost as offshore work is moved onshore. | |
| Reduced cost of installation by using the PEF method | |
| Installation possible under, inside, outside or on the weather deck of the platform. | |
| Easy de-commissioning | |
| Onshore maintenance and re-building made easy. | |
| Shut down normally not required during installation. | |
| Reduced hot work | |
| Reduced offshore crew |
TR Consulting, Joh. Falkb.gt. 10, 5538 Haugesund, Norway. Tel: +47 52729124, Fax: +47 52724196, C.E.O. Cell phone. +47 90 616969 e-mail: trcons@online.no or trcons@start.no |