LIFE BOAT PLATFORMS.

 Life boat platforms    Lifting of deck    A study    Advantages   Previous page

Life boat platforms installation.

From time to time,  the platform crew has to be increased. This may lead to an increase in required life boat capacity. In some cases new lifeboats and new lifeboat platforms have to be installed.

The life boat platforms are often positioned on the cellar deck level, and in areas not covered by the platform cranes, like in front of the living quarters etc.

Using the PEF installation method, complete lifeboat platforms with lifeboats may be fitted without using the platform cranes.

Picture showingthe lifting of a lifeboat deck on the Statford B platform using the PEF method. This picture demonstrates the problem: A new life boat deck shall be installed in front of the living quarters close to the landing of the temporary accommodation platform. The area is out of the reach of the platform cranes, is situated under the helicopter deck area and, and off course, the accommodation rig is in the way.

Picture of the life boat deck on the supply vessel. The life boat deck ready for load transfer. The sea state during transfer, even if it looks calm on the picture, was swell from aft with a corresponding max heave of some 2 meters.

 

Go to top

Lifting a life boat deck with strand jacks

 

Picture of the life boat platform during lifting.The deck after transfer and during lifting operation. Eight single strand lifting jacks were used. Two of them may be seen on the platform truss extension. The accommodation rig is still in position close by.

 

Picture showing the life boat deck under the platform during lifting. As can be seen from the picture, lifting objects very close- or under the platform is not a problem.

 

 

 

 

 

Go to top

 

A study of how to install a lifeboat platform 

 

Picture of a planned area for life boat installation. It is not easy to install a new life boat platform station at this spot.

 

Picture showing our proposed installation of lifeboats. However, this is how it will look. A complete unit installed by the PEF method.

 

 

 

 

 

Go to top

 

Advantages:

No shut-down
Outside the reach of the platform cranes
Outside the reach of floating cranes
Under the platform
Simple rigging
Very little offshore preparation work
Reduced hot work. 
Attachment by bolting
Easy to remove later
Low cost
Short mobilization time
Good availability of vessel and equipment
Flexible in relation to project schedule changes

 

 

 