Road Tunnels in Austria > 1 000 m
Tunnels aus Österreich
Edited by: Eugenio A. Merzagora
14th revision - August 2006
Country Tunnel Length (m) Date of
opening
Land Bezirk Notes Road
A Arlberg 13 972 01.12.1978 T - V LA - BZ Two linked tunnels, 3566 + 10281 m. Toll: 8,50 € S16
A Plabutsch (west tube) 10 085 17.12.2004 St G Second (east) tube: 9919 m (27.06.1987) A9
A Gleinalm 8 320 11.08.1978 St GU - LE Toll : 7,50 €. Portals altitude: 804-766 m A9
A-SLO Karawanken 8 019 01.06.1991 K VL 4 569 m in Austria. Toll: 6,50 €. Portals altitude: 620- 655 m A11
A Landeck 6 955 24.06.2000 T LA Landeck south-east ring A12/B180
A Tauern 6 765 21.06.1975 S JO - TA Natural part: 6401 m. Second tube: 6546 m (natural part: 6392 m, 2010), Toll: 9,50 € A10
A Pfänder 6 718 10.12.1980 V B Second tube (west): 6583 m (2011) A14
A Katschberg 5 898 2007 K - S TA - SP Natural part: 5414 m, breakthrough on 12.04.2006
Second tube: 5565 m (natural part:5439 m, 21.06.1975). Toll: 9,50 €
A10
A Strengen 5 851 16.12.2005 T LA Second tube: 5775 m (02.06.2006). Near Landeck. S16
A Erzberg 5 700 PRJ V BZ Flexenpass bypass. B198
A Bosruck 5 500 21.10.1983 St - O LI – KI Second tube: 5428 m (2012). Toll 4,50 € A9
A Felbertauern 5 304 1967 S - T LZ - ZE Toll: 10 € (B108)
A Schmitten 5 111 27.06.1996 S ZE Near Zell am see B311
A Roppen 5 095 06.07.1990 T IM Near Imst. Second tube: 5069 m (works start: 06.2006) A12
A Gotschka 4 760 2013 O FR Works start: 2009 S10
A Tschirgant 4 310 PRJ T IM Planned Fernpass road connection to A12 B179
A Oswaldiberg 4 307 28.06.1988 K VI - VL Second tube: 4297 m A10

A

Semmering 3 489 06.2004 N - St NK- MZ Second tube: 3414 m. Works start: 25.11.00

S6

A Pfaffenboden 3 430 2003 O KI Near Molln. Gypsum mine tunnel containing a road and conveyor belt. Private
A Ehrentalerberg 3 345 23.05.1996 K K Second tube: 3336 m A2
A Achrain 3 340 2007 V DO - B Works start: 11.1999 B200
A Waldegg 3 200 PRJ O L Linz Westring, Tunnel Süd. Second tube: 3200 m A26
A UT Stetten 3 200 PRJ W W Second tube: 3200 m. Works start: 07.2006 S1
A Lermoos 3 168 1984 T RE   B179
A Rudersdorf 3 040 PRJ B JE Works start: 2007 S7

A

Falkenberg (Rothenthurm)

3 000

2011

St

JU

Near Judenberg

S36

A

Perjen

2 993

29.01.1983

T

LA

Natural part : 2880 m. Second tube: 2900 m (PRJ). Near Landeck

S16

A Schönberg 2 988 28.10.1999 S JO Near Schwarzach B311
A Amberg 2 978 16.07.1985 V FK Second tube: 2969 m. (26.12.2003) A14
A Wald 2 924 26.05.1993 St LE Second tube: 2889 m A9
A Spering 2 852 20.09.2003 O KI Second tube: 2852 m (2012) A9
A KreuzbergI 2 823 PRJ K K Klagenfurt nortwest bypass B83

A

Kirchdorf

2 807

2008

St

BM

Second tube: 2653 m. Works start: 04/2005

S35

A Urfahr 2 775 PRJ O L Second tube: 2770 m. Linz Westring, Tunnel Nord A26
A Steinhaus/Taxlberg UT 2 720 25.08.2003 O WL Second tube: 2334 m A8
A Letze 2 612 2007 V FK Feldkirch southern bypass. Works start: 2004 B191
A Spital 2 597 27.06.2003 St MZ Second tube: 2514 m (2004) S6
A Harpfnerwand 2 590 1965 T SZ Near Mayrhofen, 1 lane, traffic light regulation. Private road before 1988. B169
A Tanzenberg 2 446 14.11.1983 St BM Second tube: 2384 m (562 + 1637 m)(1985) S6
A Langen 2 433 22.11.1991 V BZ Second tube: 2280 m. Natural parts: 2323 - 2090 m S16
A Tradenberg 2 400 PRJ W W Second tube: 2400 m. Works start: 07.2006 S1
A Lainberg 2 278 08.11.1997 O KI Near Windischgarten. Second tube: 2278 m (2012) A9
A Speltenbach 2 190 PRJ St FF   S7
A Gräbern 2 148 30.11.2003 K WO Second tube: 2144 m (26.07.1986) Near Twimberg A2

A

Klaus

2 144

20.09.2003

O

KI

Second tube: 2144 m (2012)

A9

A Ganzstein 2 135 25.06.1980 St MZ Near Murzzuschlag. Second tube: 2102 m (2008) S6
A Brandberg 2 130 1976 T SZ Near Mayrhofen/Zillertal. Private road til 1991 L 330
A Kaisermühlen UT 2 120 1986 W W Second tube: 2115 m (1992) A22
A Geisswand (Traunkirchen) 2 102 03.2008 O GM   B145
A Flötzersteig Nord 2 100 PRJ W W   B223
A Herzogberg 2 007 27.09.1982 St VO Second tube: 1958 m (28.06.2005) A2
A Hiefler 2 004 10.10.1974 S JO-HA Second tube: 1986 m (28.11.1980) A10
A Bartl-Kreuz 2 000 06.12.1996 O GM   B145
A Kalcherkogel 1 993 27.09.1982 St-K VO - WO Second tube: 1993 m. Height: 1025 m A2
A Ottsdorf/ Thurnham UT 1 940 19.12.2004 O KI Second tube: 1920 m. A9
A Rannersdorf 1 880 28.04.2006 N SW Second tube: 1880 m. Bypass A2/A4. S1
A Steinhaus 1 874 08.2004 St MZ Second tube: 1803 m. S6
A Mils 1 866 04.03.1988 T LA - IM Second tube: 1590 m A12
A Neumarkt 1 865 2013 O FR Works start: 2009 S10
A Lärchberg (Lofer) 1 859 1994 S ZE Near Lofer B178
A Passür 1 855 1996 V BZ   B197
A Lake Gmunden 1 820 PRJ O GM   B120
A Dalaas 1 810 16.12.1979 V BZ Second tube: 1755 m (PRJ) S16
A Tiefenbach 1 729 1982 T IM Near Soelden/Oetztal. Portals altitude 2672 m (North) - 2822 m (South). Highest road tunnel in Europe, 2nd highest paved road in Europe. Toll road to Tiefenbach glacier summer ski area.  
A Rainbach 1 635 2013 O FR Works start: 2009 S10
A Noitzmühle UT 1 610 25.08.2003 O W-WL Second tube: 1610 m A8
A Klamm 1 603 1973 S ZE Near Lend B167
A - SLO Loibl 1 566 1943 -
1964
K KL Loibl Pass, 893 m in Austria. Work started in 1943 by 1300 prisoners from consentration camp Mauthausen B91
A Pians - Quadratsch 1 545 29.06.1994 T LA Second tube: 1545 m (Two linked tunnels, 698 m + 806 m) S16
A Achberg 1 510 1993 S ZE Near Unken B178
A UT Kreuzenstein 1 500 PRJ W W Second tube: 1500 m. Works start: 07.2006 S1
A Holltobel-Flexenpass

1 490

 

V

BZ

Avalanche protection. Will be bypassed by Erzbergtunnel B198
A Stuben 1 485 PRJ V BZ   B197
A Vierzehn 1 450 2013 O FR Works start: 2009 S10

A

Kienberg

1 438

07.05.2001

O

KI

Second tube: 1430 m (20.09.2003)

A9

A Ofenauer 1 385 10.10.1974 S HA Second tube: 1320 m (28.11.1980) A10
A Schattberg 1 370 PRJ S ZE Mittersill soutwest bypass B168
A Lärchenwand (Kaprun) 1 360 1947 S ZE One lane, 12% slope. Not for public use. Bus shuttle service to Mooserboden dam TK
A Nicklasdorf 1 345 19.09.1986 St LE Second tube: 1232 m S6
A Brettfall 1 336 1995 T SZ In Zillertal B169
A City 1 311 01.06.1984 V B Slipway Bregenz A14
A Neumarkt i.M. 1 310 21.09.2003 O FR Second tube: 1310 m (2009) B310
A Löruns 1 290 PRJ V BZ   L188
A Hallstatt 1 254 23.07.1966 O GM Second tube: 1121 m L 547
A - D Füssen - Grenztunnel 1 245 24.07.1999 T RE In Austria: 340 m  B179/A7
A Schartnerkogel 1 232 11.08.1978 St GU Second tube: 1167 (1981) A9
A Bruck 1 228 01.12.1987 St BM Second tube: 1208 m S6
A Flirscher - Gondebach 1 226 16.12.1979 T LA Two linked tunnels: Flirsch (872m) and Gondbach (354 m). Three lanes, two in direction Arlberg S16
A Falkenberg 1 170 17.07.1995 K K Second tube: 1090 m A2
A Grünburg 1 165 2004 O KI Works start: 2001. Breakthrough: 27.07.2003 B140
A Kaltenbach 1 165 2008 St BM Second tube: 1011 m. Works start: 04/2005 S35
A Mitterberg 1 143 27.09.1982 St VO Second tube: 1142 m A2
A Reibhaeusl-Mittersill 1 115 PRJ S ZE   B161
A Sonnstein (Bartl-Kreuz 2) 1 087 1993 O GM   B145
A Zams 1 070   T LA   S16
A Linz - Bindermichl UT 1 062 28.11.2005 O L Second tube: 1062 m. A7
A Hausmannstätten 1 051 PRJ St GU   B73
A Selzthal 1 010 28.06.1980 St LI Second tube: 958 m (12.04.2000) A9

Warm thanks to: Walter Brummer, Olliver Haas, Markus Pfitscher

NOTES:
UT: Unterflurtrasse (Covered Road)
GB: Grünbrücke (Green Bridge, for ecological reason)
Red: under costruction
Pink: in project

Comments and questions to: Eugenio A. Merzagora

More Road Tunnels in Austria :

Wien - Tunnel, Unterführungen und Passagen  
Die "Heimatseite"  –  Geschichte(n) aus OÖ  

Home

Google

© 2003. Copying from the data pages is not allowed without adding the source name: "The World's longest Tunnel Page"

This page was last modified on August 25, 2006